.
Scroll mouse to zoom in or zoom out
Scroll mouse to zoom in or zoom out
This product is made of high-quality 3D-printed PETG plastic. Ample room in the hook area for those with weighted follower rods too. Installation: No tools required. Remove the primer alarm and the primer tube top nut. Thread this holder onto the primer tube with the hook area up. Thread it all the way on then back a little bit as needed to position it to the side as pictured. Reinstall the primer tube top nut. Due to variances in machines, the top nut may or may not be tight for desired alignment. Reinstall the primer alarm..
Dillon Primer Rod Holder